- Steel
- DSA Shelters
- PC Structures
PC Structures
Gable Roof – REK PC #02-121214
You choose the structure dimensions that work best for your project!
Maximum Dimensions
Width: 20′ & 30′
Clear Height: 10′
Pitch: 4/12
Hip Roof – RAM PC #02-121213
You choose the structure dimensions that work best for your project!
Maximum Dimensions
Width: 20′ & 30′
Clear Height: 10′
Pitch: 4/12
Monoslope – MSL PC #02-121212
You choose the structure dimensions that work best for your project!
Maximum Dimensions
Width: 15′, 25′, & 35′
Clear Height: 10′
Pitch: 1/12
Walkway Cover– CWC PC #02-121211
You choose the structure dimensions that work best for your project!
Maximum Dimensions
Width: 10′ & 15′
Clear Height: 10′
Pitch: 1/12
DSA PC Process
Project Definition
- Contact Poligon engineering or sales representative
- Review design intent
- Select PC type and size
- Poligon provides quote (project specific)
- Print out full-size drawings and go through checklist on first sheet of PC drawings (call Poligon engineering or sales representative with questions)
DSA Approval
- Submit full-size Poligon PC drawings to DSA (with checklist filled out) along with rest of project drawings
- Send any Poligon related DSA comments (SS, FLS, and/or AC)
- Poligon provides documentation summarizing our responses to present at the back-check appointment
- Poligon structure received DSA approval
Purchasing/Shipping
- Send Poligon copy of DSA approved drawings for specific project (required before placing order)
- Submit purchase order through local Poligon sales representative (including frame and roof color)
- Coordinate in-plant special inspections with the district and the Inspector of Record (IOR). In the absence of a preferred contact, Poligon Sales representatives can provide information for local inspectors near Poligon’s facility.
- Arrange the optimal shipping date via your local Poligon sales representative.
- Poligon structure arrives on site
Installation/Project Close Out
- Poligon available to answer questions from inspectors and/or installers
- Poligon aviailable to provide additional sketches, letters, etc. required to address field issues (signed and sealed by California SE). Small fees may apply if Poligon not responsible for challenge requiring a solution.
- Poligon available to assist with DSA project closeout documents as required